<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">28</journal-id>
      <journal-title-group>
        <journal-title>《现代化工技术》原《现代化工》</journal-title>
        <abbrev-journal-title>Modern Chemical Engineering Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：3104-770X(P)/3104-7718(O)；原ISSN：2661-3670(P)/2661-3689(O)</issn>
      <publisher>
        <publisher-name>华文国际出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">26442</article-id>
      <title-group>
        <article-title>水利水电工程施工阶段的安全风险评估与控制</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>蒋海明 湖北云水建设工程有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>1</month>
      </pub-date>
      <issue>1</issue>
      <abstract>
        <p>水利水电工程作为国民基础设施的重要组成部分，其施工阶段因工序繁杂、作业环境特殊、安全因素多样，极易发生各类安全事故，严重威胁工程质量和人员生命安全。本文从施工阶段的风险特征出发，分析其主要安全隐患及成因，构建系统性的风险评估指标体系，采用多种方法进行科学评估。结合典型案例进行实证分析，探讨了有效的风险控制策略，包括制度管理、技术手段、人员培训和动态监控等多维度措施。研究结果表明，建立科学、全面的安全风险评估与控制机制，有助于提高水利水电工程施工阶段的安全管理水平，具有良好的实践意义与推广价值。</p>
      </abstract>