<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7215-39</article-id>
      <article-id pub-id-type="publisher-id">13059</article-id>
      <title-group>
        <article-title>火力发电电气开关柜安装调试优化策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>张金隆 中国能源建设集团天津电力建设有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>5</month>
      </pub-date>
      <issue>5</issue>
      <abstract>
        <p>本文通过对电气开关柜在火力发电厂中重要功能及作用的分析，结合实际对存在的电力电气开关柜安装调试中工期长、技术和环
境影响等方面问题的分析，提出了改进安装前的准备工作、提高调试过程与过程管理、应用智能化与自动化的措施和技术以及对设备制造
商的合力互助等改善方法，从而达到改进安装调试工作质量和效益的目的，确保开关柜设备安全稳定运行，为火电厂的安全、经济运行做
好安全保障。
关键词：火力发电厂；电气开关柜；安装调试；优化策略</p>