<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7218-3</article-id>
      <article-id pub-id-type="publisher-id">14831</article-id>
      <title-group>
        <article-title>EPC 模式下工程造价风险识别与应对策略研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>金 丹</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>EPC 项目作为一种综合性工程承包模式，具有高风险、高投资、高技术含量的特点，其造价管理对项目成功至关重要。本文从 EPC
模式全生命周期视角出发，梳理了设计优化偏差、供应链波动、现场管理失序三类核心风险，提出前端防控-过程纠偏-动态闭环的应对框
架。研究强调以合同弹性设计、数字孪生技术应用、利益相关方协同机制为突破口，建立含决策层、执行层、监督层的立体化管控体系，
为 EPC 项目造价管理提供理论支撑与实践参考。
关键词：EPC 模式；造价风险；全生命周期；协同管控</p>