<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7218-48</article-id>
      <article-id pub-id-type="publisher-id">14876</article-id>
      <title-group>
        <article-title>土地报批滞后对轨道交通项目成本-进度耦合影响机理研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>黄太熙</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>在我国轨道交通项目中，土地报批滞后这一问题普遍存在，特别是在大规模城市轨道交通建设当中，此现象对项目的整体进度以
及成本控制产生了颇为严重的影响。向来，传统的轨道交通项目管理往往更多地侧重于施工阶段，却忽略了土地报批这一前期环节给项目
整体执行所带来的深远意义。本文针对土地报批滞后对轨道交通项目成本与进度的耦合影响展开机理研究，探讨其怎样经由延误施工计划、
增添临时成本以及造成资源浪费等方式，进而对轨道交通项目的成本与进度耦合关系施加影响。经研究发觉，土地报批滞后不但使项目的
资金压力增大，还致使项目进度失去控制，从而形成一种恶性循环，对项目的最终交付质量与效益产生影响。借由提出优化土地报批流程、
提升行政效率以及制定合理的项目缓冲期等对策，便可有效缓解土地报批滞后所带来的负面效应。该研究对于推动轨道交通项目实现高效
管理、降低建设风险以及提高社会经济效益，具备着重要的理论意义与实践价值。
关键词：土地报批滞后；轨道交通项目；成本-进度耦合</p>