<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7218-87</article-id>
      <article-id pub-id-type="publisher-id">14915</article-id>
      <title-group>
        <article-title>工程资料完整性对钢结构厂房竣工验收的影响机制研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>罗 威</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>工程资料的完整性在钢结构厂房竣工验收过程中具有至关重要的作用。随着钢结构工程的复杂性日益增加，现有的工程资料管理
体系存在数据不全、资料更新滞后、信息沟通不畅等问题，导致竣工验收时无法准确反映项目实际情况，影响了验收结果的真实性与可靠
性。本文旨在研究工程资料完整性对钢结构厂房竣工验收的影响机制，分析资料不完整或不准确对验收过程的具体影响，探讨如何通过完
善资料管理、加强信息流通、规范化文件归档等措施提升资料完整性，从而提高竣工验收的效率与质量。研究发现，工程资料的完整性直
接关系到验收工作的顺利进行，缺失或不准确信息往往导致验收延迟或失败。进一步分析表明，建立一套高效的资料管理系统，确保各类
资料的及时更新和归档，是保障竣工验收质量的关键。该研究对提升建筑行业工程项目的管理水平、促进工程质量和验收流程的优化具有
重要意义。
关键词：工程资料；钢结构厂房；竣工验收</p>
      </abstract>
    </article-meta>
  </front>
</article>
