        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7312-1</article-id>
      <article-id pub-id-type="publisher-id">18182</article-id>
      <title-group>
        <article-title>试论目视助航工程在跑道盖被工程中的施工方法</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>胡英杰</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>12</month>
      </pub-date>
      <issue>12</issue>
      <abstract>
        <p>在跑道盖被工程中，多采用关闭跑道及夜间航后施工相结合的不停航施工方式，要对现有的的原灯具管线，以及施工区域外的其
他目视助航设施进行保护。在施工过程中，当天铣刨摊铺区域灯具无法满足第二天开航使用，采用临时隔变、临时电缆等倒改措施保证该
施工段前后灯光正常使用，对于关闭跑道而又开放部分联络道，原来共回路的灯具，做临时电缆导改，保证该联络道灯光正常使用，其灯
光电缆根据要求就近接入开启的灯光回路。
关键词：目视助航工程；跑道盖被；施工方法</p>