<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12361/2705-1269-7312-75</article-id>
      <article-id pub-id-type="publisher-id">18261</article-id>
      <title-group>
        <article-title>对建筑机电安装工程中工序穿插要点与相关的注意事项研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>雷锦华</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>12</month>
      </pub-date>
      <issue>12</issue>
      <abstract>
        <p>本文系统研究了建筑机电安装工程中工序穿插的关键要点及实施过程中的注意事项。通过深入分析机电安装工程在不同施工阶段
的工序安排与协调机制，揭示了工序穿插对工程质量和施工效率的重要影响。研究表明，科学合理的工序穿插可缩短工期 15%-25%，降低
施工成本 10%-20%，同时能有效减少各专业间的施工冲突。文章详细探讨了从基础施工到系统调试全过程的工序衔接技术，提出了基于 BIM
技术的三维可视化穿插方法，并针对施工中常见问题提出了具体解决方案。研究结果为建筑机电安装工程的精细化管理提供了理论依据和
实践指导，对提升机电安装质量与效率具有重要参考价值。
关键词：机电安装；工序穿插；施工协调；质量控制；进度管理；BIM 技术</p>