<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071548</article-id>
      <article-id pub-id-type="publisher-id">20953</article-id>
      <title-group>
        <article-title>房建施工成本超支问题及管控方法</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王虹先</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>15</month>
      </pub-date>
      <issue>15</issue>
      <abstract>
        <p>本文系统研究房建施工成本管理的核心矛盾与治理路径，研究发现成本特征呈现动态性，设计变更波动 18-25%、政策市场传导；
复杂性，多专业叠加 12-15%、装配式投入产出波动 15-20%；不确定性，地质风险 20-30%、资金延迟连锁损失三重特性。成本超支关键问
题集中于前期策划缺陷，估算误差±15%、准备金＜3%、过程管控失效，变更滞后 70%、材料超耗 15-20%，和体系制度短板，责任划分 45%、
数字化率 30%。针对痛点构建"三维两翼一平台"管控体系，前期通过地质建模+AI 算法将估算误差控制在±8%，过程依托电子化审批和智
能调度实现精细控制，体系层面建立成本责任矩阵和 BIM 预警平台。研究形成"技术赋能——制度约束——智能优化"的闭环解决方案，为
工程成本治理提供可复制的系统性范式。
关键词：房建施工成本；动态性特征；成本超支；系统性管控</p>