<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071575</article-id>
      <article-id pub-id-type="publisher-id">20980</article-id>
      <title-group>
        <article-title>房地产项目竣工验收滞后成因分析及高效推进对策研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>陈金华 广州西溪投资发展有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>15</month>
      </pub-date>
      <issue>15</issue>
      <abstract>
        <p>房地产项目竣工验收是保障工程质量、实现项目交付与资产盘活的关键环节，直接关系到开发企业资金回笼效率、业主合法权益
及城市建设秩序。近年来，受政策调整、多方协同不足、质量管控缺位等因素影响，竣工验收滞后已成为房地产行业普遍面临的痛点，不
仅增加企业资金成本与运营风险，还易引发业主信访纠纷。本文结合文献研究与行业实践，从政策法规、建设单位、参建单位、政府监管
及外部环境五个维度，系统剖析竣工验收滞后的核心成因，并针对性提出“标准统一化、流程协同化、管理精细化、监管智能化”的高效
推进对策，为破解房地产项目验收难题、促进行业健康发展提供实践参考。
关键词：房地产项目；竣工验收；推进对策</p>