<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-250715129</article-id>
      <article-id pub-id-type="publisher-id">21034</article-id>
      <title-group>
        <article-title>施工项目进度-成本协同优化管理与突发干扰因素应对研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>杨庆坚 广东建宏安建筑工程有限公司天河分公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>15</month>
      </pub-date>
      <issue>15</issue>
      <abstract>
        <p>施工项目管理中，进度与成本协同优化是保障项目经济与时间效益的关键。本文围绕施工项目进度-成本协同优化管理及突发干扰
因素应对展开研究。首先，剖析进度与成本目标关联性及协同优化理论基础，探讨当前管理模式中目标冲突、资源配置失衡等问题；其次，
构建进度-成本协同优化模型，结合动态控制理论与系统工程方法，提出基于多目标决策的优化路径，实现资源高效利用与目标均衡；最后，
针对常见突发干扰因素（如极端天气、供应链中断、设计变更等），分析其对进度与成本的耦合影响机制，建立应对框架，形成“预防-监
测-调整-反馈”全流程应对策略。研究旨在为管理者提供协同优化方法与干扰应对工具，提升项目抗风险与综合管理水平，推动施工项目
管理向精细化、智能化发展。
关键词：施工项目管理；进度-成本协同；优化模型</p>