<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071657</article-id>
      <article-id pub-id-type="publisher-id">21847</article-id>
      <title-group>
        <article-title>民航机场可行性研究投资估算与初步设计概算的衔接机制构建</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>汪志玉 广东泛珠勘察设计有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>16</month>
      </pub-date>
      <issue>16</issue>
      <abstract>
        <p>民航机场投资估算与设计概算是项目造价控制中前后衔接的关键环节，二者常因编制依据、深度及信息传递不畅而脱节。投资估
算以可行性研究阶段的类比指标为基础，为设计概算提供基准“红线”；设计概算则依据初步设计图纸据实计算，反向验证估算的合理性。
为弥合二者鸿沟，需构建系统的衔接机制。该机制遵循合规性、一致性与动态性原则，采用“前期协同-过程控制-后期反馈”的闭环框架，
其核心要素包括统一的项目分解结构、动态计价标准、全过程信息平台及风险预警机制。关键实施路径在于：通过统一 WBS 实现费用科目
的精准对应；推动设计深度与计价精度的动态匹配；建立全过程造价信息的传递与反馈流程。这一系列措施能够有效提升估算与概算的匹
配度，降低偏差率，为民航机场项目的科学决策与高效建设提供坚实的造价管理支撑。
关键词：民航机场；投资估算；设计概算</p>