<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071666</article-id>
      <article-id pub-id-type="publisher-id">21856</article-id>
      <title-group>
        <article-title>大型公建项目室内设计与施工一体化管理机制</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>钟桂凤 深圳杰恩建筑设计有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>16</month>
      </pub-date>
      <issue>16</issue>
      <abstract>
        <p>大型公建项目室内设计与施工一体化管理机制，旨在解决传统模式下因信息不畅、责任不清导致的效率低下与成本失控问题。该
机制的核心在于构建一体化的组织架构与协同工作模式，通过组建联合管理团队与驻场设计制度，打破设计与施工的壁垒。同时，依托贯
穿项目全生命周期的 BIM 信息共享平台，实现设计图纸、施工进度与现场问题的实时交互与同步更新，确保信息传递的准确性与时效性。
此外，建立统一的合同体系与风险分担机制，明确各方责任边界，并设置协同奖励条款，激励双方主动合作。在实施路径上，强调项目前
期的一体化策划、施工过程中的实时协调以及竣工阶段的联合验收，确保设计意图的精准落地与项目品质的最终保障。这一整套系统性的
管理机制，有效提升了大型公建项目的建设效率、控制了工程成本，并保证了最终建成效果与设计目标的高度一致。
关键词：大型公建；室内设计；施工管理</p>