<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071683</article-id>
      <article-id pub-id-type="publisher-id">21873</article-id>
      <title-group>
        <article-title>全过程造价管理视角下工程算量、概算、预算与结算的协同优化研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>黄锡铃 广东建伟工程咨询有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>16</month>
      </pub-date>
      <issue>16</issue>
      <abstract>
        <p>在工程建设领域，全过程造价管理是控制项目成本、提升投资效益的核心手段，而工程算量、概算、预算与结算作为造价管理的
关键环节，其协同效率直接决定造价管控效果。当前工程实践中，四者常因数据割裂、标准不一、责任脱节等问题，导致造价超支、结算
争议频发。本文结合全过程造价管理理论，先界定算量、概算、预算与结算的核心内涵及逻辑关联，再分析四者协同现存的核心问题，最
后从数据协同、机制协同、标准协同、动态管控四维度提出优化策略，并结合实际案例验证策略有效性。研究表明，通过构建一体化协同
体系，可将结算超预算率控制在 5% 以内，显著提升造价管理精度与项目经济效益，为工程建设领域造价管控提供实践参考。
关键词：全过程造价管理；工程算量；概算；预算；协同优化</p>