<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071692</article-id>
      <article-id pub-id-type="publisher-id">21882</article-id>
      <title-group>
        <article-title>PPP项目政府与承包商结算差异处理实务研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>梁大丰 佛山市地铁建设有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>16</month>
      </pub-date>
      <issue>16</issue>
      <abstract>
        <p>PPP 项目因周期长、主体多、利益关联复杂，政府与承包商的结算差异已成为影响项目推进与政企合作的关键瓶颈，不仅易引发
纠纷、延长回款周期，还可能损害公共服务供给效率，亟需从实务层面探索系统性解决方案。鉴于此，本文通过系统剖析 PPP 项目结算差
异的表现形式、产生成因以及结算差异处理的实务难点，提出“事前预防－事中管控－事后化解”的全流程处理策略，以期为 PPP 项目参
与方优化结算管理、减少争议纠纷提供实务参考，助力提升项目运营效率与合作稳定性，推动 PPP 模式健康可持续发展。
关键词：PPP 项目；结算差异；处理实务</p>