<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-25071821</article-id>
      <article-id pub-id-type="publisher-id">22674</article-id>
      <title-group>
        <article-title>风电光伏工程成本与进度协同管理研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>陈培丹 武汉工程大学</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>18</month>
      </pub-date>
      <issue>18</issue>
      <abstract>
        <p>随着新能源产业的快速发展，风电光伏工程在能源结构转型中占据关键地位。工程管理中，成本控制与进度管控是核心目标，二
者的协同优化直接影响工程综合效益。本文以工程管理理论为基础，结合水利水电、市政及新能源工程实践经验，分析风电光伏工程成本
与进度协同管理的现状及存在的问题，提出基于目标协同、过程协同、技术协同的三维管理体系，并通过模糊化处理的工程案例验证策略
有效性。研究结果表明，通过建立动态管控机制、优化资源配置、应用数字化管理工具，可实现成本与进度的动态平衡，提升工程管理效
率与经济效益。本文研究为风电光伏工程及相关新能源项目的协同管理提供参考，助力行业高质量发展。
关键词：风电光伏工程；成本管理；进度管理；协同优化；工程管理</p>