<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-250719037</article-id>
      <article-id pub-id-type="publisher-id">23215</article-id>
      <title-group>
        <article-title>建筑工程施工进度管理的影响因素与管控策略</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>关 峰 连云港连辉房地产开发有限公司</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2025</year>
        <month>19</month>
      </pub-date>
      <issue>19</issue>
      <abstract>
        <p>在建筑工程中，施工进度受到多种因素的综合影响。如何对其进行有效管理，确保各影响因素的合理把控是施工管理的重点。为
了避免进度延误，保障质量的同时，确保施工项目的如期交付，本文主要探究了建筑工程施工进度影响因素及其应对措施，通过全面分析
以及提高建筑工程质量，以期保障建筑工程的顺利施工，提高其整体收益。基于此，本文针对建筑工程施工进度管理的影响因素与管控策
略进行重点分析。
关键词：建筑工程施工；进度管理；影响因素；管控策略</p>