        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080416-62</article-id>
      <article-id pub-id-type="publisher-id">30118</article-id>
      <title-group>
        <article-title>水利水环境土方工程“规划—施工—生态”三维全过程 管控研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王安琪 河北汉丰造价师事务所有限公司 河北石家庄 050000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>7</month>
      </pub-date>
      <issue>7</issue>
      <abstract>
        <p>土方施工是贯穿水利水环境项目建设全程的基础性工序，管控成效直接决定堤防稳定、行洪安全及水环境治理效果。水利水环境
工程临水作业多、含水率变化大、生态要求高，传统粗放管理易引发压实不足、边坡失稳、弃土无序堆放及水体二次扰动。本文结合 2025
年新版水利土石方验收标准，从土方平衡优化、工序精细管控、生态绿色施工三个维度，构建了全过程管控体系。依托白洋淀、唐河治理
等工程实践，验证了该体系的应用价值。研究表明，全流程闭环管控与生态协同推进，可有效解决施工质量波动、资源利用率低、生态防
护薄弱等共性问题，推动土方施工向精细化、绿色化转型。
关键词：水利工程；水环境治理；全过程管控；土石方平衡；环保绞吸船；</p>