<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080416-88</article-id>
      <article-id pub-id-type="publisher-id">30144</article-id>
      <title-group>
        <article-title>土木工程施工现场进度管理优化研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>伍志强 绵阳职业技术学院 四川绵阳 621000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>7</month>
      </pub-date>
      <issue>7</issue>
      <abstract>
        <p>施工进度管理是土木工程项目管理的核心环节，直接影响工期目标与经济效益的实现。本文围绕施工现场进度管理优化展开研究，
从基本问题入手，分析传统方法的适用性与局限，构建工期-成本均衡与资源约束下的进度优化模型，引入关键链缓冲管理思想。在此基础
上，探讨 BIM 技术、实时数据采集与信息协同等信息化手段在进度优化中的应用，并从组织流程、技术经济及动态调控三个维度提出系统
化的优化策略与保障机制，为提升施工进度管理的科学性与实效性提供理论参考。
关键词：施工进度管理；进度优化；关键链；BIM 技术；动态调控</p>