        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080416-109</article-id>
      <article-id pub-id-type="publisher-id">30165</article-id>
      <title-group>
        <article-title>新能源 EPC 总承包项目概算与财务评价协同机制研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>邵永强 张 伟 中国电建集团西北勘测设计研究院有限公司 陕西西安 710100</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>7</month>
      </pub-date>
      <issue>7</issue>
      <abstract>
        <p>新能源 EPC 总承包项目投资规模大、建设周期长、政策调价要素多，概算编制与财务评价分属造价管理、投融资管理两条业务线，
二者数据口径割裂、动态调整不同步是制约项目投资管控、收益测算真实性的核心痛点。本文以新能源项目全生命周期管理逻辑为基础，
建立从概算初稿编制到项目竣工后评价的闭环协同流程体系，明确各阶段数据传递标准、变更同步规则与复盘联动要求。依托标准化量化
指标完成协同实施效果量化对比，验证协同机制对投资偏差控制、财务测算精度、项目决策效率的提升作用。研究成果可为风电、光伏类
新能源 EPC 总承包项目造价与财务一体化管控提供技术路径与管理参考，降低项目投资失控风险，提升项目经济评价结果可信度。
关键词：EPC；总承包项目；概算</p>