<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080418-2</article-id>
      <article-id pub-id-type="publisher-id">30669</article-id>
      <title-group>
        <article-title>拟建工程临近轨道交通线路交叉节点力学影响分析</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>李 伟 1 庚同哲 2 樊振通 2 王 震 2 孔洋洋 2 姜海洋 2 1.济南轨道交通集团建设投资有限公司 山东济南 250014</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>2.中国建筑第八工程局有限公司 山东济南 250014</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>为探究高架桥工程基础施工对既有轨道交通交叉节点的影响，以济南市凤凰黄河大桥南延工程临近轨道交通 3、6 号线为依托工程，
借助有限元模型，分析了跳仓法下桩基、承台施工过程中轨道交通 3、6 号线车站主体结构、出入口、风道以及隧道区间的力学响应。结果
表明，6 号线区间隧道最大下沉量为 6.96 mm，主体结构最大水平变形为 1.18 mm；3 号线区间管片最大沉降为 3.31 mm，最大沉降位置为与
6 号线凤凰路站~王舍人站区间交叉处，最大水平位置为 0.33 mm；变形缝内侧的主体结构最大沉降变形为 2.77 mm，变形缝两侧结构最大
差异沉降为 1.46 mm，主体结构横向位移最大值为 0.27 mm；区间隧道结构内力变化较小，承载力满足要求。
关键词：市政工程；高架桥桩；临近地铁；交叉节点；结构内力；数值计算</p>