<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080418-19</article-id>
      <article-id pub-id-type="publisher-id">30686</article-id>
      <title-group>
        <article-title>基于工程全生命周期的不平衡报价造价风险分析与管控研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>马振丽 河北汉丰造价师事务所有限公司 河北石家庄 050000</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>工程量清单计价模式下，不平衡报价是建筑承包商在投标过程中常用的策略，具体表现为在投标总价保持不变的前提下，通过调
整分项工程的综合单价，实现自身预期盈利目标。该策略若合理运用，能够有效提升承包方的经济效益；但一旦被滥用，便容易引发工程
投资超概、造价管控失效、结算纠纷频发等问题，进而扰乱建筑市场正常的计价秩序。
从现状来看，学界与业界的相关研究多集中于投标阶段的不平衡报价识别，缺乏对全生命周期的分段系统分析，尤其忽视了各建设阶段间
造价风险的传导效应。基于此，本文立足工程造价全过程管控视角，明确不平衡报价的概念及形成机理，深入分析各阶段不平衡报价的造
价风险特征与传导逻辑，并结合雄安新区某水利工程实际案例，剖析各阶段造价管控中存在的漏洞，从四个维度提出全流程防控措施。本
文研究成果可为工程造价风险防控、工程量清单计价规范化管理以及减少工程结算争议，提供相应的理论参考与实操支撑。
关键词：不平衡报价；工程造价；全生命周期；清单计价；造价风险；全过程管控</p>