<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">29</journal-id>
      <journal-title-group>
        <journal-title>《建筑施工与发展》</journal-title>
        <abbrev-journal-title>CONSTRUCTION AND DEVEL OPMENT</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN：2737-4262；EISSN:2705-1269</issn>
      <publisher>
        <publisher-name>华文科学出版社</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.12421/JZSGYFZ2705-1269-080418-22</article-id>
      <article-id pub-id-type="publisher-id">30689</article-id>
      <title-group>
        <article-title>成本管控体系完善地产工程建设管理模式</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王园峰 南昌市政公用集团房地产有限公司 江西省南昌市 330038</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>8</month>
      </pub-date>
      <issue>8</issue>
      <abstract>
        <p>成本控制体系是提高地产工程建设管理效率、保证投资效益的重要保障，对于房地产工程管理模式向精细化、规范化转变有着十
分重要的作用。本文主要研究成本控制体系和工程建设管理方式之间的联系，从全过程目标设定、组织责任协同、动态监控、信息化保障
等方面出发，对完善途径进行系统的研究。研究表明，创建起涵盖设计、招标采购、施工和竣工全过程的成本控制体系，可以很好地弥补
传统模式粗放滞后、责任不明的不足之处，促使管理由被动纠偏向主动预防转变，从而达成进度、质量、成本三者协同改善的目的。通过
目标分解、标准固化、全链贯通来加强执行刚性的同时，也为地产工程管理提供可持续的体系支持，对行业提高运行效率和竞争力有现实
的参考意义。
关键词：成本管控；地产工程；建设管理模式；全过程动态监控</p>